No projects yet. Click + ADD NEW PROJECT/S to get started.
1SELECT METHOD
2PROJECT INFO
3UPLOAD FILE
HOW WOULD YOU LIKE TO ADD PROJECT/S?
Choose an import method below. You can always add or edit project details after creation.
📊
IMPORT FROM BILLING PLATFORM ...
Upload a raw Schedule of Values export from your billing platform (Textura, Sage, Procore, etc.). Your export must include at least 3 columns with headers: Contract Description, Line Item / Sub-Phase Description, and Scheduled Value. histORACLE maps the columns automatically and classifies every line item.
✏️
ADD MANUALLY
Enter project info and fill in a blank bid package cost summary. Ideal for projects not in Textura or high-level historical data entry.
📦
BULK IMPORT
Upload a multi-project Schedule of Values export. Your export must include 4 columns with headers: Project Number / Name, Contract Description, Line Item / Sub-Phase Description, and Scheduled Value. histORACLE automatically creates a separate project for each unique Project Number found.
📑
SINGLE PROJECT G702/G703 PDF UPLOAD BETA
Upload one project's complete subcontractor pay requisition PDF (text PDFs only, no scans). histORACLE reads each G702 "From Contractor" as the contract name, assigns the G703 line items that follow it, leaves out change orders, and lets you pick a BP for each contract before classifying.
PROJECT DETAILS
Fill in the project specifics. These drive your $/SF and escalation calculations.
COST BREAKDOWN
Enter the Bid / GMP total from the bid summary sheet.
ESCALATION
Defaults to today
Default 4% · typical 3–6%
ESCALATION FACTOR
—
Enter contract date and rate
UPLOAD LINE ITEMS
Your export must include 3 columns with headers: Contract Description, Line Item / Sub-Phase Description, and Scheduled Value. Export directly from your billing platform — no formatting needed. histORACLE maps the columns and classifies every line item automatically.
No file selected
📊
Or drag and drop your file here
Import your raw Schedule of Values export from Textura or equivalent billing software — no column stripping needed. histORACLE finds the right columns automatically.
⚠ Excel library not loaded. Check internet connection and reload.
MANUAL BID PACKAGE ENTRY
Enter your final contract costs by bid package. Use this when you don't have an SOV file — ideal for storing high-level historical cost data.
BID PKG
DESCRIPTION
CONTRACT VALUE ($)
TOTAL TRADE COST$0
CM/GC Markups can be itemized in the Project Info tab after creating the project.
UPLOAD G702/G703 PAY REQUISITION PDF BETA
Upload the full subcontractor G702/G703 packet for one project. Text PDFs only — scanned images are not supported. The PDF is read in your browser and is not uploaded anywhere.
No file selected
📑
Or drag and drop the pay requisition PDF here
Each G702 starts a contract; the G703 pages after it are its line items. Change orders are flagged and not imported. The original contract sum on the G702 must equal the line items.
BULK IMPORT FROM BILLING PLATFORM ...
⚠ Required: Your file must contain a unique project/job number column for each project. Without this identifier histORACLE cannot separate your data into individual projects.
Your export must include 4 columns with headers: Project Number / Name, Contract Description, Line Item / Sub-Phase Description, and Scheduled Value. histORACLE will create a separate project for each unique Project Number found.
No file selected
📦
Or drag and drop your bulk export here
Import a multi-project Schedule of Values export from Textura or equivalent billing software. histORACLE splits by Project Number automatically.
Select a sort and drag line items here to assign them to categories
BID DATA
Each bid package's awarded value, matched exactly to the Cost Summary's Bid Package breakdown — plus up to 8 columns for recording every bid received on that package, and a live average across whichever of those are filled in.
PROJECT INFORMATION
No image
Shows at the top of this project's card on the home screen. Automatically resized for storage — large photos are fine to upload.
Total critical IT load — drives $/MW
Total project SF including renovation + new/addition areas
COST BREAKDOWN
Enter the Bid / GMP total from the bid summary sheet. The CM/GC Markups line is calculated for you, and you can itemize it below.
—
Auto-totalled from imported line items · read only
—
Auto-calculated · Bid / GMP Total minus SOV Import Total
CM/GC MARKUPS BREAKOUT (optional)
Itemize what sits above the trades in the Bid / GMP Total. These don’t change the cost summaries. General Conditions and Site Services also show as $/month in the comparison metrics.
ESCALATION
Defaults to today · adjust to project future
Default 4% · typical 3–6%
ESCALATION FACTOR
—
Contract date → current date
PROJECT METRICS
Information can be edited or filled in once project is added. Additional metrics coming soon.
GENERAL / OVERALL
No floors defined
A10/20/40/60/90 — SUBSTRUCTURE
Footprint of the building, not total GSF — drives Substructure/foundation cost
Enter a footprint value above to see this project's A Substructure $/SF Footprint (SOG)
Total project concrete (spans Substructure and Shell Structure — pulled from MasterFormat 03 Concrete, shown here for convenience)
Enter concrete volume above to see this project's $/CY
B10 — SUPERSTRUCTURE
Total structural steel tonnage/weight for the project — used to gauge how "heavy" (and likely costly) the structure is
Enter steel weight (and GSF above) to see this project's LBS/GSF
Enter steel weight above to see this project's $/Ton (pulled from MasterFormat 05 Metals)
B20 — EXTERIOR VERTICAL ENCLOSURES
Enter envelope area to see this project's Envelope $/SFCA
No glazing types defined
No cladding types defined
B30 — EXTERIOR HORIZONTAL ENCLOSURES
Pick this project's actual Roofing bid package — roofing is almost always let standalone, so this gives a clean $/SF
Select a Roofing BP above (and enter Roof Area) to see this project's $/SF of roof
C10 — INTERIOR CONSTRUCTION
Fill in whichever one matches how partitions get priced — linear foot of wall, or square foot of wall surface. Either (or both) is fine.
C20 — INTERIOR FINISHES
D40 — FIRE PROTECTION
Enter head quantity to see this project's Fire Protection $/Head
D20 — PLUMBING
Recommended: count drains and hose bibbs as 1/2 fixture each
Enter fixture quantity to see this project's Plumbing $/Fixture
D30 — HVAC
D50 — ELECTRICAL
D60 — COMMUNICATIONS
Typically includes: DAS, Telecom, Audiovisual, Nurse Call, Public Address, Clock, etc.
D70 — ELECTRONIC SAFETY & SECURITY
Typically includes: Fire Alarm, BDA/ERCC, Video Surveillance, Access Controls, Intrusion Detection, Video Intercom, etc.
D10 — CONVEYING
Total stops across all elevators/escalators — drives $/Stop for Conveying
Enter stop quantity to see this project's Conveying $/Stop
F20/30 — FACILITY REMEDIATION & DEMOLITION
May differ from new building GSF — affects $/GSF accuracy
Enter demo area to see this project's Demolition $/SF Demo
G10/20/30/40/50/90 — SITEWORK
Enter site acres to see this project's Sitework $/Acre
PROJECT NOTES
CLASSIFICATION REFERENCE GUIDE
Use this guide when classifying line items.
UNIFORMAT — CSI/CSC 2010
Organizes costs by building system
LEVEL 1
LEVEL 2
DESCRIPTION
TYPICAL SCOPE
A Substructure
A10
Foundations
Standard & special foundations, foundation walls, footings
A20
Subgrade Enclosures
Below-grade perimeter walls enclosing basement space
A40
Slabs-on-Grade
Standard & structural slabs, slab trenches, pits & bases
Add, rename, or remove options for each dropdown column. Saved to your browser.
⚠ BEFORE YOU START
A quick step that makes auto-classification much more accurate
Auto-classification relies heavily on the contract name. Names that start with the bid package number — for example BP26 Electrical or BP03 Concrete — give it the most to work with.
Rename them in Manage Contracts — each name shows whether it matches as you type. The ⚠ next to that button stays until every contract matches.
⚡ RECODE VISIBLE ROWS
Apply classification to all currently visible line items
Only set this if every visible row genuinely shares the same L3 — otherwise leave it blank and reassign L3 individually after recoding, so varied rows don't all get forced to one value.
Only visible rows will be changed. Filter by contract first to target a specific package.
⚠ CONFIRM RECODE
SEARCH LINE ITEMS
SEARCH UNIT PRICES
HOW IT WORKS
Follow these steps to get your first project into histORACLE — about 10 minutes once your file is ready.
1
RETRIEVE YOUR SOV EXPORT
Log into Textura (Oracle), Procore, Sage, or your construction billing platform and export the subcontractor Schedule of Values for your project. Your export must include at least 3 columns with headers: Contract Description, Line Item / Sub-Phase Description, and Scheduled Value. For bulk multi-project imports, a 4th column is required: Project Number / Name. No formatting or column stripping needed — import the raw export directly.
2
EXPORT AS EXCEL
Run the Schedule of Values report in your billing platform and export as Excel (.xlsx). histORACLE finds the 3 required columns automatically and classifies every line item by Uniformat, Masterformat, and Bid Package. If only a PDF is available, you will need to convert it to Excel first using a PDF-to-Excel converter such as Bluebeam Revu (Export → Excel), Adobe Acrobat (Export PDF → Spreadsheet → Excel), or a free online tool like Smallpdf.com or ILovePDF.com. Once converted, import as normal.
3
CLICK + ADD NEW PROJECT/S
Click the + ADD NEW PROJECT/S button in the top right of the header to open the project wizard.
4
ENTER KEY PROJECT METRICS
Fill in project name, job number, sector, GMP date, total GMP value, GSF, and escalation rate (default 4%). These drive your $/SF and escalated $/SF calculations. Additional project metrics — including structure type, HVAC system, envelope type, project duration, and more — can be edited or filled in at any time after the project is created in the Project Info tab.
5
IMPORT YOUR EXCEL FILE
On Step 2 of the wizard, upload your raw SOV export. histORACLE automatically finds the correct columns and loads every line item. Click CREATE PROJECT.
6
REVIEW & ADJUST THE AUTO-SORT
histORACLE auto-classifies most line items using its built-in keyword library, but every SOV is worded a little differently, so some lines may need correction. Open the Line Items tab and review the Uniformat, Masterformat, and Bid Package dropdowns for each row. Use Apply to All in the column headers to code an entire contract at once when every line in it belongs to the same classification.
7
USE DRAG & DROP FOR FASTER RECLASSIFICATION
For a faster, more visual way to fix misclassified line items — especially when several items across different contracts need to move to the same classification — use the Drag & Drop Reclassify tool, available from the Line Items tab. Select one or more line items and drag them onto the correct Uniformat or Masterformat classification. This is the quickest way to get your baseline sort fully accurate.
8
GET YOUR BASELINE SORT RIGHT BEFORE STARTING CUSTOM SORTS
A Custom Sort in the Cost & Sort Builder tab works from your line items' existing Uniformat classification. If a line item's Uniformat code is wrong, it'll be harder to find when you go looking for it inside a category breakdown. Finish Steps 6 & 7 — a fully accurate Uniformat / Masterformat / Bid Package sort — before moving into Custom Sorts, so you're not troubleshooting two things at once.
9
USE CUSTOM SORTS FOR CATEGORY-LEVEL DETAIL
Once your baseline sort is accurate, open the Cost & Sort Builder tab to break any set of line items into your own categories — for example, splitting Plumbing into Fixtures, Piping Systems, and Equipment, or building a unit price comparison. Name the sort, add categories, and drag line items in (or use the dropdown next to each item). It's a blank slate every time — build whatever breakdown the project actually needs.
✓
YOU ARE FINISHED!
Your project is saved to the repository. The Cost Summary tab shows your full breakdown by Bid Package, Uniformat, and Masterformat with $/SF and Escalated $/SF.
💡 PRO TIP
The more projects you add, the more powerful histORACLE becomes — reliable sector benchmarks built entirely from your own data.
UNIFORMAT EDITOR
Click · Ctrl/⌘+Click · Drag to bucket
UNIFORMAT LEVEL:
⚠ Note: Line items tagged Overhead (mobilization, permits, cleanup, etc.) don't take a Level 3 code. In Cost Summary, Compare, and the Estimate Builder their dollars are spread across the other line items in the same contract, so they never show up as their own line.
Clear
UNIFORMAT L2
FLOOR-TO-FLOOR HEIGHTS
Add each floor with its floor-to-floor height in feet.
TYPE BREAKDOWN
Add each type present on this project along with its approximate area. This lets the Cost Builder match against projects with similar envelope composition instead of lumping everything into "Mixed."
TYPEAREA (SF)
WEIGHTED LINE ITEMS
RE-CLASSIFY CONTRACT LINES?
MANAGE CONTRACTS / BID PACKAGES
Add or edit contracts and bid packages. Keep your own contract names and use the dropdown beside each one to choose how its line items are classified. When you assign a BP to a line item, its Contract Description will automatically update to match.
💡 The more detailed a contract description is, the more accurately it auto-classifies — a name like "AEG Contractors" gives auto-classify nothing to work with, but "AEG Flooring Contractors" does.
Name each contract like this:
BP## - Trade (your details) e.g. BP10 - Specialties (Lockers)
The BP number does most of the matching. The trade word after it, from the list below, makes it an exact match.
Some BP numbers cover several trades (BP03, BP07, BP09, BP11…). The trade word is what picks the right one.
Singular or plural both work: Window Treatment or Window Treatments.
Put anything extra in parentheses so the name stays standard.
✓ green BP number and trade word matched · ◐ amber BP number matched, add a trade word from the list · ✗ red no match, check the BP number
Changes apply immediately to all line items when saved.
CONFIRM COLUMN MAPPING
CONFIRM COLUMN MAPPING
CLASSIFICATION REFERENCE GUIDE
Use this guide when classifying line items.
UNIFORMAT — DETAILED REFERENCE (UF1/2/3)
Every Level 3 code, its typical line items, and what it covers — search to jump straight to a code, material, or keyword